From a working layout through cabinets, counters and the finishes that tie it together.
A kitchen is the densest room in a house. Water, waste, power and ventilation all have to land in exact places, and every one of them has to be right before a single cabinet goes on the wall. That is why kitchens go wrong in the sequence rather than in the finishes.
The layout comes first, and it is decided by what the room can actually take, where the stack is, which walls carry load, what the floor is sitting on. Once that is settled, the order runs one way: rough-in, board, floor, cabinets, counters measured off the installed cabinets, then splashback and paint.
Counters are templated after the cabinets are set, never before, because a half-inch of cabinet shim moves a countertop seam. Getting that order right is most of what separates a kitchen that lands on time from one that stalls.
Walls, ceilings, trim and exteriors. Prepped properly first, because paint hides nothing.
03Full bathroom refits, tub-to-shower conversions, tile, vanities and the waterproofing behind it all.
04Turning the floor nobody uses into real rooms, once the moisture question is honestly answered.
05Hardwood, LVP, laminate and tile, laid on a subfloor that was actually made flat first.
What you see at the end is the last of five layers, and the order decides whether the finish holds.
Everything that is coming out comes out first. What is behind the wall decides what is possible in front of it.
Anything that has to live inside the wall goes in before it closes. Then drywall, taped and set flat.
The floor goes down and the trim goes on. Both are cut to the room as it actually is, not as it should be.
Prep, prime, cut in, coat. Paint is the layer everyone judges and the one that shows every shortcut underneath it.
Rated 4.7 on Google across 70 reviews. Every quote below is verbatim, spelling and all, and the critical ones are on that profile too.
After having the same door on a house built in the 1950s, the frame finally gave out Sunday afternoon. My wife and I called everyone we could find and were given the craziest quotes along with no assurance that they could get the work done when we needed it. We need a functional front door after all. We called MDM, left a message, and within an hour we had an appointment for NEXT MORNING at a fraction of the cost of the other estimates were given. Incredible service, and very professional. By Monday afternoon, we had a new front door that we love! Could not recommend them enough!
Quoted verbatim from Google reviews. Spelling and punctuation are the reviewers’ own.
Remodeling is priced off the actual room, so it starts with seeing it rather than with a number.
What it is now, what you want it to be, and roughly when.
A window rather than a vague day, and the name of who is coming.
What is included, what is not, and the cost, on paper, before any deposit.
Rough work, board, floor, trim, then paint, in the sequence that holds.
Older brick housing stock with plaster walls, tight stairs and rooms that were never quite square, which is exactly the ground this kind of work is made for.
Tell us about the room and roughly when you would like it done.